Halliburton

Project Details

In 2018, we started off with the project, erecting a total of 24 tanks. This included 16 base oil tanks, 6 barite tanks, and 2 mixing tanks. Additionally, we handled the petrochemical piping of carbon steel schedule 40 & 80 pipes to suit plants for gas and oil, installed pumps, and constructed stairways and guide rails.